Cost Worksheet for New Connections to Lake City Water Department Trunkage and Availability & Sanitary Drain #1
1 Of note, the water connection and sanitary drain represent separate $3,000.00 costs ($6,000.00/combined total cost for both).
1 Of note, the water connection and sanitary drain represent separate $3,000.00 costs ($6,000.00/combined total cost for both).
In pursuit of the RRC certification, I developed this Zoning document to supplement the materials that have already been developed by the CLC.